The proposed bridge rehabilitation project is located in Pima County on I-10 approximately 10 miles east of Vail and 13 miles west of Benson between milepost 291.98 and milepost 292.65. The work consists of bridge rehabilitation on various bridges; structure # 485 EB, # 786 WB, # 787 EB and # 788 WB at Amole Interchange. The work also includes replacing existing pavement, fog coat application, construct a new cast-in-place deck, approach slabs, concrete barrier and expansion joints, apply polyester polymer concrete overlay, and replace existing guardrail, slope paving repair, restriping and other related works.