Project Planholders List

096 YV 010 F058401C 096-A-(200)T BAGDAD - HILLSIDE HIGHWAY (SR 96) (Santa Maria River Bridge)
NorthWest DistrictItem # 100216
Engineering Specialist: Brandon Campbell
Pre-Qualification: YES
Bid Opening: 5/15/2026 11:00:00 AM

System Preservation (Bridge Replacement)

The proposed project is located in Yavapai County, on SR-96 at the Santa Maria River Bridge. The work consists of removing and replacing the existing bridge. Additional work includes asphaltic concrete pavement replacement, hot applied chip seal coat with fog coat application, cattle guard replacement, guardrail replacement, pavement marking, and other related work.
Proposal Pamphlet Contact Numbers Date
NON Bid Sets Contact Numbers Date
ATL-CMT
2921 B 30TH AVE
PHOENIX, AZ 85017
Tel: (602) 241-1097
Fax: (602) 277-1306
3/24/2026
KELLER NORTH AMERICA, INC. (FORMERLY HAYWARD BAKER, INC.)
7550 TEAGUE RD, SUITE 300
HANOVER, MD 21076
Tel: (410) 551-8200
Fax: (410) 799-3786
3/27/2026

Last Updated 4/2/2026 7:35 AM